Deliverable D2.2 Integration of Technical Components

This deliverable details how technical components proposed in work packages WP3 and WP4 have been pre-selected and integrated for each of the 5 identified core services into service specific air interfaces in order to prepare the final phase of integration into a flexible and multi-service air interface. Moreover the document presents the first evaluation results of selected technical components. The final selection of technical components will be based on these implementation results. Finally a complete description of the link2system models is given.