Deliverable D2.3 Final air interface description and system level simulation results

DR2.3 summarizes the results of work package WP2 (System Requirements, Integration, and Evaluation). In the first part (Section 2), we analyse and assess the technical components from work packages WP3 and WP4. We highlight the advantages and disadvantages of each technology and discuss interdependencies and tradeoffs. We also discuss how the technologies address the main project goals, The second part (Section 3) shows the results of the system level simulation campaigns. We evaluate how the proposed technologies perform with respect to the FANTASTIC-5G use cases and requirements. The simulations demonstrate the flexibility and performance of the proposed air interface within a multi-service environment.